Loft Coversion September 2009  Installation and management.  To convert a two bedroom semi to a three bedroom property. Spec to include en suite bathroom Ist and second fix electrics and bespoke built in furniture and floating wooden floor.

PICT0075.JPG

First Fix Of Ensuite .

PICT0074.JPG

Built In Cupboards Under The Eaves Of House

PICT0079.JPG

Preparation for new stairs to complete second floor.

PICT0083.JPG

Ist Fix Of Fire Party Wall

PICT0099.JPG

James and a Plaserbaorded and sound proofed party wall conforming to Building Regs. Celetex Insulation with Manufactured Board bracing for sound reduction.

PICT0100.JPG

Cupboards approaching completion. Shelving complete just architrave and doors to hang. Designed with space saving the key. Utilising this void creates space for storage and free's finished room floor space.

PICT0112.JPG

Steve and Sean Perrett completing Plastering. Note installation of first fix electrics.

PICT0125.JPG

Installation of floating wooden floor and Cupboard Doors prior to painting. I lined the floor with 4mm hardwood and 6mm underlay to create souding proofing and heat/cold inslulated.

stereo.jpg

Built in stereo stacking system. All wiring concealed out of sight. HDMI cable for wall mounted HD built in to fire party wall.

Photo036.jpg

Built in Bespoke cupboards in use! Skirting still to be added.

Flatscreentv.jpg

Photo049.jpg

Photo049.jpg

Photo049.jpg

Stairs ordered from Churchview Joinery, Wimbourne made to satisfy building regs. Three man lift though! Solid wood throughout no man made boards and high quality. Hand rail to be installed very soon.